Hydroseeding &
Barkblowers, Inc.

Phone: (253) 770-0242  

SERVICES PROVIDED

  1. Barkblowing
  2. Berm Building
  3. Hydroseeding
  4. Prep
  5. Rockslinger / Conveyor Taruck
  6. Jute Netting Installation

Prep - Rock Raking For

  1. Pastures
  2. Farms
  3. Arenas
  4. Schools
  5. Ballfields
  6. Residential Lawns
  7. Soil Installation
  8. Sod Cutter (Sod Removal)

 

Read More... 

 

 

Erosion Control Seeding          


Lawn Mixes   


Other Mixes
 


Additives
 


Hydroseeding East Puyallup, WA

Hydroseeding Watering Schedule:

Garden sprinkler||||

WEEK 1-6 Two to three light waterings per day. (Depending on weather) WEEK 7-10 One heavy watering per day. WEEK 10 + One watering per week or as needed depending temperatures. (1" of water per week usually adequate.) WATERING INSTRUCTIONS: Yard must be well drained prior to darkness. NEVER WATER AFTER DARK. The fiber andseed shall be irrigated lightly and frequently to maintain optimum moisture content for maximum germination. (Two to three waterings per day for up to 5 weeks, duration depending on type of soil). The watershould be left on long enough to soak the soil thoroughly to the depth of the fiber, plus about 2" of your top soil take care not to wash thefiber or soil particles off the slopes. (Keep yard damp like a wet wash cloth as much as possible.)

If your seed starts to germinate and doesn't receive ample water the new sprouts will, die causing a thin looking lawn.

After germination, over watering keeps oxygen from the soil and causes shallow rooting. The lawn roots must stretch down for waterand other sources of food. With shallow root systems you must provide food constantly. Climate and season also affect watering frequency. Asafe rule of thumb, (after 4 weeks) is to water deeply at longerintervals. This lets the moisture penetrate to the full depth of the roots. Shallow watering evaporates before moisture and nourishmentreaches the root structure. Try to water in early morning, whenevaporation is slower and there's less likelihood of sun scorching.

NOTE: THE RYE GRASS BLEND WILL SHOW IN 5-6 DAYS WITH EVENINGTEMPERATURES AT THE 50+ RANGE. THE FESCUE BLEND WILL TAKE 4-5 WEEKS,TOTAL.
NOTE: THE GREEN MULCH WILL TURN BROWN AS THE SUN BLEACHES OUTTHE DYE. IF PROPER AMOUNTS OF WATER GIVEN THE MULCH WILL LOOK LIKE WETCARDBOARD. IRRIGATION

The irrigation system must be observed while in operation toestablish irrigation sequence and timing. It is imperative that the soilbe kept moist without over watering or washing away mulch duringgermination period. Timer setting new lawn 5:30-6 A.M., 11 A.M., 4 P.M.,(Always at least 1.5 hours before dark). The frequent irrigationsequence should continue until the seedlings have grown beyondirrigation stage. (about 6 weeks)

(SEE CHART AT BEGINNING OF LAWN CARE FOR 10+ WEEKS ANDBEYOND)ESTABLISHED LAWN:Irrigation sequence (watering) frequency shouldbe reduced while the duration of each watering cycle shall be increased. Watering 7-10 weeks and beyond. NOTE: In about 2-3 WEEKS YOUR LAWN WILL HAVE SOME AREA'S LONG ENOUGH TO MOW. MOW IT ALL. SOME AREAS MAY STILL LOOK A LITTLE THIN. NOT TO WORRY. GIVE MORE WATER TO THIN AREAS.SHADESIDE OF MIX TAKES A LITTLE LONGER TO ESTABLISH MOWING SCHEDULE:When your new lawn is long enough that your lawn mower will cut the grass, evenif ALL the grass is not long enough to mow yet, we want you to mow thegrass.  

We don't want to grow the tops but, we want the roots to grow, Morefrequent mowing will cause your new lawn to sod up much quicker twomowing per week is recommended if you can find the time. Mow at 2" - 21/2 minimum, for the first 6 months, as grass fills in you can lower cutto desired height. In cool weather "Spring and Fall" you can keep lawnshort but in "HOT" summer raise cut 2"-2 1/2, this will allow grass tohold more water.  

WEEDS:Although our seed mix has maximum of .005% weed seed, there can beweeds in the soil prior to our Hydroseeding process. In late out ofseason plants yard is more susceptible to weed infestation. Most weedswill die with mowing those that don't die can usually be eliminated withone treatment of Scott Turf Builder + II at 8-10 weeks after planting.Or if late out of season plant run Scott Turf Builder + II in spring. Ifweeds persist Ortho Weed Be Gone applied per instructions selectivelywill eliminate weeds.

FERTILIZATION:Your new Hydroseeded lawn will not usually need fertilizerfor 6 weeks. We recommend you buy for the season which you arefertilizing for, Spring fertilizer, Summer Turf Builders or Fall. Besure to read the directions carefully. Improper application can damageyour lawn.

* IF YOU LAWN EVER STARTS TO YELLOW, YOU KNOW IT IS TIME TO FERTILIZE.
GUARANTEE LAWNS WITH PRE-GERMINATION, APRIL 1ST – OCTOBER 10TH
GUARANTEE LAWNS WITH NO PRE-GERMINATION, APRIL 15TH – SEPTEMBER 30TH
GUARANTEE EROSION, APRIL 1ST – OCTOBER 15TH
EROSION APRIL 1ST – OCTOBER 15TH  

Hydroseeding, Inc guarantees a solid stand of grass on acceptable soil, providing lawn care is in compliancewith our instructions, we can not be responsible for preexisting factorsbeyond our control such as neglect, disease, weeds, annuals, crabgrass, insects, fungus, abuse, or hostile acts or if LATE Fall planting. If late fall planting fertilize by March 15ththe following Spring. We will not be responsible if you over water and mulch washes. To stay incompliance with warranty you must fertilize in the seventh week. Seeother Lawn Services available from Hydroseeding & Barkblowers, Inc.We blow Bark,Organic,Play chips, Stearco, sliverless play chips. THANKSFOR SELECTING HYDROSEEDING, INC. SINCERELY, THE MANAGEMENT &EMPLOYEES ENJOY YOUR NEW YARD !

"Provided honest estimate and on-time service. Excellentcustomer service and the representative for the company did a good jobexplaining the care for the lawn & was in and out in a flash. It'sbeen a little over a week and the lawn is already looking great." 

-Good Prices & Great Service by EA98383 - 09/10/2007